wongkingming civil engineering technical world

Tuesday, 25 October 2016

Piling On Limestone Bedrock in Kuching (2)


Still not very convinced, a second borehole was drilled near to the piling location.



Wow! The limestone rock cores were even more beautiful! 
How did the 200x200 RC piles managed to penetrate 30m into such bedrock?



Posted by Unknown at 09:27
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

Unknown
View my complete profile

Blog Archive

  • ►  2017 (2)
    • ►  January (2)
  • ▼  2016 (44)
    • ►  December (4)
    • ▼  October (8)
      • Half Baked Phyllite Phyllite is a metamorphosed r...
      • Phyllite Cores It is not easy to obtain a good co...
      • Phyllite Near to the Heart Centre Hospital of Kuc...
      • Marble Look like the limestone at this Kuching Sa...
      • Piling On Limestone Bedrock in Kuching (3) Limes...
      • Piling On Limestone Bedrock in Kuching (2) Still...
      • Piling On Limestone Bedrock in Kuching (1) The ...
      • Failure of the Cantilever Roof Over the Window Th...
    • ►  September (1)
    • ►  August (1)
    • ►  May (3)
    • ►  April (3)
    • ►  March (7)
    • ►  February (11)
    • ►  January (6)
  • ►  2015 (105)
    • ►  December (3)
    • ►  November (2)
    • ►  October (6)
    • ►  August (3)
    • ►  July (27)
    • ►  June (64)
Simple theme. Powered by Blogger.