Piling On Limestone Bedrock in Kuching (2)
Still not very convinced, a second borehole was drilled near to the piling location.
Wow! The limestone rock cores were even more beautiful!
How did the 200x200 RC piles managed to penetrate 30m into such bedrock?
No comments:
Post a Comment